{"id":4915,"date":"2024-08-09T09:59:29","date_gmt":"2024-08-09T13:59:29","guid":{"rendered":"https:\/\/davieconstruction.com\/?p=4915"},"modified":"2024-08-13T12:17:37","modified_gmt":"2024-08-13T16:17:37","slug":"specialized-due-diligence-design-development-2","status":"publish","type":"post","link":"https:\/\/davieconstruction.com\/specialized-due-diligence-design-development-2\/","title":{"rendered":"Veterinary Development 101: Post Design Development"},"content":{"rendered":"

By Frank Chapman
\nExecutive Vice President of Medical Construction
\nDavie Construction Co.<\/p>\n

After we completed the due diligence package, which addressed design development, the schedule for building your animal hospital moved into the post-development phase. Frankly, this process is very detailed, and the paperwork can seem overwhelming. However, by working with Davie Construction Co., this seemingly tedious set of requirements is handled comprehensively and seamlessly based on our extensive experience. Overlooking even the most innocuous detail can result in delays and additional costs that many G.C.s without our specialized knowledge have realized. No one would want to collect all the documents required for permitting without a seasoned team leading the way!<\/p>\n

Every community has a different set of directions for submitting construction documents to obtain relevant permits. We are very familiar with the variances in this documentation and understand exactly what is needed to secure permits as quickly and successfully as possible. We start by determining which zoning and building requirements will be enforced in the governing municipality. This guides our preparation of the packet.<\/p>\n

Our research also includes collaboration with local fire marshals to anticipate their requirements. Specific documents will include:<\/p>\n